7 Victoria7 Victoria8 Tile-After8 Tile-Before9 Escalator-After9 Escalator-Before10 Second Floor-After10 Second Floor-Before11 Elevator-After11 Elevator-Before12 Public Area-After12 Public Area-Before13 Stairs-After I13 Stairs-After II13 Stairs-Before I13 Stairs-Before II14 Floor Tile-After14 Floor Tile-Before15 Food Court-After15 Food Court-Before16 Food Court II-After16 Food Court II-Before17 Food Court III-After17 Food Court III-Before1 Parking Lot Signage-After1 Parking Lot Signage-Before2 Signage-After2 Signage-Before3 Parking Lot Lights-After3 Parking Lot Lights-Before4 Coronado Signage-After4 Coronado Signage-Before5 Signage-After5 Signage-Before6 Sears-After6 Sears-Before

Coronado Center Refresh Project

Posted on by culp

Location:  Northridge, CA

Owner:  General Growth Properties

Architect:  KTGY Group

Total Gross Leasable Area:  1,100,000 SF

Completed:  January 2015

Project Description: Renovations included new tile, paint, ceiling modifications, and lighting upgrades throughout the mall concourses. The signage program was also re-designed including directionals and blade signs. Amenities were also replaced with a new package.

The food court received a brand new look including new bulkhead treatment, column and neutral pier finishes and ceiling modifications. All 7 entrances also received a brand new look along with new exterior wayfinding signage for the center.